Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the members domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /usr/local/www/apache24/noexec/WKV/website/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-maximum-upload-file-size domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /usr/local/www/apache24/noexec/WKV/website/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the translatepress-multilingual domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /usr/local/www/apache24/noexec/WKV/website/wp-includes/functions.php on line 6114
Water-to-wire von WKV – mit grüner Energie Geld verdienen

WATER-TO-WIRE

Everything from a single source: Optimally coordinated hydropower solutions, completely developed and manufactured in one place.

PROFIT CENTRE FROM A SINGLE SOURCE

You only provide the powerhouse; we take care of the entire inner workings. Water-to-Wire means: Wasserkraft Volk AG designs, plans, manufactures and produces under one roof everything you need to transform the power of water at the location of your choice into clean electricity; for your usage or for feeding it into the power grid. Investing in a sustainable future could hardly be easier.

WATER-TO-WIRE

ALL INCLUDED FOR YOUR SUCCESS

As the only provider worldwide, Wasserkraft Volk AG offers the complete planning and manufacture of the main components of hydroelectric power stations under one roof and from a single source. Because we are the only hydropower specialist in the world who does not only builds turbines, but also the appropriate highly efficient synchronous generators together with all the necessary controls.

Fully independent, regardless of whether you want to build a small hydroelectric power station in the kW range or a big one in the MW range: You only have one contact person for all your technical questions. And at WKV, that often means: an advising session with the boss included!

Our scope does not end at the commissioning. Of course, we also support you in operating your power station safely, reliably and economically. Not only during the warranty period, but over the many decades of the power-station productive lifespan. We have an extensive archive that fully documents each power station.

GET MORE INFORMATION AND COUNSELLING